by Jody Kotkin | Feb 14, 2022 | Project Controls & Cost Estimates
Reliance is providing Independent Cost Estimating (ICE), Schedule Reviews, and Constructability Reviews to the MassDOT Highway Division as part of a Master Services Agreement Contract for Project Controls Analysis on a Task Order basis for projects in Districts 3 and...
by Jody Kotkin | Feb 14, 2022 | Constructability, VE, & Risk Assesment, Project Controls & Cost Estimates
Reliance provided a constructability review based on 75% of plans and specifications for the proposed improvements to the MBTA’s Symphony Station. Our scope also included a review of the proposed utility relocation methodology, proposed support of excavation design...
by Jody Kotkin | Feb 14, 2022 | Bridges, Short to Medium Span Bridges, Specialized Technical Services
M6 Grand Rapids consists of 187-ft long S02 and 223-ft long S03 simple span bridges with twin box girder bridge superstructures. These bridges required the replacement of the existing superstructure which had plate girders as steel erection issues were experienced by...
by Jody Kotkin | Feb 14, 2022 | Bored Tunnels, Tunnels & Underground Construction
The Boston Harbor Effluent Outfall Tunnel is a MWRA’s 25-ft diameter tunnel, extending approximately 9.5 miles out into Massachusetts Bay—the longest single-entry tunneled outfall in the world. The Boston Harbor cleanup project includes the Deer Island Treatment...
by Jody Kotkin | Feb 14, 2022 | Geostructural, Tunnels & Underground Construction
Holland Tunnel is a landmark tunnel connecting lower Manhattan and Jersey City. This is the first Hudson River vehicular crossing connecting Canal Street in Manhattan with 12th and 14th Streets in Jersey City. Sena Kumarasena, Ph.D., PE served as the Project Engineer...