M6 Grand Rapids consists of 187-ft long S02 and 223-ft long S03 simple span bridges with twin box girder bridge superstructures. These bridges required the replacement of the existing superstructure which had plate girders as steel erection issues were experienced by...
Project Experience
Short to Medium Span Bridges
Storrow Drive Bridge
Storrow Drive is an award-winning single-cell box girder. The unique bridge, including a 380-ft main span and 225-ft back spans carrying a Storrow Drive bridge is an award-winning, signature, single-cell steel box girder bridge carrying 4-lanes of traffic over the...
Long Island Bridge Replacement Project
Reliance, as part of a previous GEC assignment for the City of Boston Department of Public Works (DPW), developed the accelerated bridge replacement methodology as a part of a long-term sustainability study for this aging, 3,500-ft long critical link from the mainland...
MBTA Green Line Extension Project
In 2016, MBTA appointed Reliance as part of the Interim Project Management Team (IPMT) tasked with bringing the project costs under the allocated budget of $2.1 billion from the $3.0 billion projected at that time. Reliance served as the Value Manager on the IPMT...