In 2016, MBTA appointed Reliance as part of the Interim Project Management Team (IPMT) tasked with bringing the project costs under the allocated budget of $2.1 billion from the $3.0 billion projected at that time. Reliance served as the Value Manager on the IPMT...
Project Experience
Bridges
US Grant Cable-Stayed Bridge
This 1,685-ft-long, three-span, two-tower, cable-stayed bridge with a main span of 875 feet replaced the old U.S Grant suspension bridge over the Ohio River at this location. The new bridge features a steel-composite superstructure supported with two cable planes...
Second Tacoma Narrows Suspension Bridge
The Second Tacoma Narrows is a 5,979-ft long, 2,800-ft main span suspension bridge with a superstructure height of more than 200-ft above the river high-water elevation. The 78-ft-wide superstructure consists of a space truss with the orthotropic deck that also acts...