Reliance provided a constructability review based on 75% of plans and specifications for the proposed improvements to the MBTA’s Symphony Station. Our scope also included a review of the proposed utility relocation methodology, proposed support of excavation design and the construction schedule, and the cost estimate developed by the design team. Reliance developed a constructability checklist and a constructability review report, presenting the findings to the MBTA and the design team. Reliance is currently working with PMA Consultants on providing a risk assessment to the MBTA on this project based on the 100% construction documents.