Fort Point Channel Tunnel

Location: Boston, MA (1994)

Owner: Massachusetts Turnpike Authority (MTA)

Prior Experience: Tony Lancellotti

Fort Point Channel Tunnel is a concrete immersed tube tunnel constructed as part of Boston’s Central Artery/Tunnel project. Tony Lancellotti, PE served as the Lead Engineer for the Type Study of various tunnel alternatives for this crossing including steel shell, concrete box, and bored tunnels. He also led the preliminary design of selected tunnel options. He was responsible for oversight of the preparation of technical reports, cost estimates, and recommendations for client approval, overseeing the final design developments by the section design consultant, project delivery, and technical and administrative management of the project.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Your Title Goes Here