MBTA Green Line Extension Project

MBTA Green Line Extension Project

In 2016, MBTA appointed Reliance as part of the Interim Project Management Team (IPMT) tasked with bringing the project costs under the allocated budget of $2.1 billion from the $3.0 billion projected at that time. Reliance served as the Value Manager on the IPMT...

US Grant Cable-Stayed Bridge

US Grant Cable-Stayed Bridge

This 1,685-ft-long, three-span, two-tower, cable-stayed bridge with a main span of 875 feet replaced the old U.S Grant suspension bridge over the Ohio River at this location. The new bridge features a steel-composite superstructure supported with two cable planes...

Second Tacoma Narrows Suspension Bridge

Second Tacoma Narrows Suspension Bridge

The Second Tacoma Narrows is a 5,979-ft long, 2,800-ft main span suspension bridge with a superstructure height of more than 200-ft above the river high-water elevation. The 78-ft-wide superstructure consists of a space truss with the orthotropic deck that also acts...